Parts list · Buying guide
Electric service parts list: transformer to meter base
Disclosure: we earn a commission if you buy through links on this page, at no extra cost to you. It never affects what we recommend. How we make money.
A new 200-amp underground service typically needs Schedule 40 PVC conduit and long-radius sweeps, a Schedule 80 riser with an expansion fitting, warning tape, a utility-approved ringless meter-main, 4/0 aluminum service conductors if you supply the lateral, two 8-foot ground rods with acorn clamps, 6 AWG copper grounding conductor, and a torque tool for the lugs.
| Category | Part |
|---|---|
| Conduit | Gray Schedule 40 PVC electrical conduit (belled end) |
| Conduit fitting | PVC expansion fitting for the riser |
| Trench | Underground electric warning tape |
| Conductors | 4/0-4/0-2/0 aluminum URD cable |
| Conductors | Southwire aluminum SEU service entrance cable |
| Meter base | Eaton MBE24L200BTS 200 A meter breaker (EUSERC) |
| Meter base | Meter-main with underground pull section |
| Panel | Main breaker load center with breaker kit |
| Grounding | Copper-bonded ground rods with acorn clamps |
| Grounding | Bare solid copper grounding wire |
| Termination | Torque screwdriver or torque wrench |
| Add at the service | Eaton CHSPT2ULTRA whole-home surge protector |
| Add at the service | Generator interlock kit and 50 A power inlet box |
| Add at the service | Whole-home standby generator with transfer switch |
| Add at the service | Level 2 EV charger (48 A, hardwired) |
Check your utility first. Utilities set conduit size, burial depth and approved meter bases. Buying the wrong meter base is the most common and costly mistake.

Conduit
Gray Schedule 40 PVC electrical conduit (belled end)
The standard underground raceway for a service lateral. Belled ends glue together without separate couplings.
- Size
- 2 in. or 3 in., per your utility
- Use
- Underground run; Schedule 80 for the exposed riser
- Pair with
- PVC cement, long-radius sweeps
Conduit fitting
PVC expansion fitting for the riser
Lets the riser move as soil settles or freezes so the meter base isn't pulled off the wall.
- Use
- Riser below the meter base, where your utility requires it
Trench
Underground electric warning tape
Required about 12 inches above buried service conductors under NEC 300.5(D)(3).
- Color
- Red, printed CAUTION BURIED ELECTRIC LINE
Conductors
4/0-4/0-2/0 aluminum URD cable
The common 200-amp underground service lateral cable when the customer supplies the conductors.
- Use
- 200 A service lateral in conduit
- Check
- Whether your utility supplies the lateral

Conductors
Southwire aluminum SEU service entrance cable
Unarmored service entrance cable with two insulated conductors and a bare concentric neutral, sold by the foot.
- Size
- 4/0-4/0-4/0 Al for 200 A (NEC 310.12)
- Use
- Weatherhead to meter, or meter to an outdoor disconnect
- Not for
- Indoor feeders that need a separate ground; use SER

Meter base
Eaton MBE24L200BTS 200 A meter breaker (EUSERC)
A 200-amp meter socket with a 2-space Type BR breaker section in one NEMA 3R outdoor enclosure. It is a main-lug unit, so no main breaker is included; you add Type BR breakers.
- Rating
- 200 A, 120/240 V single phase
- Spaces
- 2 spaces, up to 4 circuits (Type BR breakers)
- Socket
- 4-jaw, ring type, EUSERC design
- Feed
- Overhead or underground; line lugs #6 to 250 kcmil
- Check
- EUSERC and ring-type sockets are used mainly by western U.S. utilities. Many others, including AEP, require ringless. Confirm your utility's approved list.

Meter base
Meter-main with underground pull section
Wide enclosure with large line lugs below the meter for heavy underground laterals, plus a main breaker and neutral/ground bar.
- Use
- Underground services with large aluminum conductors
- Check
- Lug range fits your conductors; utility approval

Panel
Main breaker load center with breaker kit
Indoor panel with a main breaker and a starter set of single- and double-pole breakers. With an outdoor meter-main, it is fed as a subpanel with neutrals and grounds kept separate.
- Size
- 200 A, enough spaces for future circuits
- Check
- AFCI/GFCI breakers required for your circuits

Grounding
Copper-bonded ground rods with acorn clamps
Two 8-foot rods spaced at least 6 feet apart are standard for a new service. Acorn clamps must be listed for direct burial.
- Size
- 5/8 in. x 8 ft
- Qty
- Two rods, two clamps

Grounding
Bare solid copper grounding wire
The grounding electrode conductor from the service to the ground rods.
- Size
- 6 AWG solid copper to rods (NEC 250.66(A))
- Length
- Enough to reach both rods in one continuous run
Termination
Torque screwdriver or torque wrench
NEC 110.14(D) requires lugs to be tightened to the manufacturer's torque value with a calibrated tool.
- Range
- Covers meter-base lug values, often 250+ in-lb
Add at the service
Eaton CHSPT2ULTRA whole-home surge protector
A Type 2 surge protective device that mounts in two breaker spaces. NEC 230.67 requires surge protection on new and replaced dwelling services.
- Type
- Type 2 SPD, 108 kA
- Fits
- Eaton BR and CH panels; check your panel brand
Add at the service
Generator interlock kit and 50 A power inlet box
Lets a portable generator back-feed the panel safely by locking out the main breaker. A lower-cost alternative to a transfer switch.
- Check
- Kit must be listed for your exact panel model
- Pair with
- 50 A inlet box and generator cord
Add at the service
Whole-home standby generator with transfer switch
A natural gas or propane standby generator with an automatic transfer switch powers the house within seconds of an outage.
- Size
- 22–26 kW for most 200 A homes with load management
- Plan
- Decide before the service is built so the transfer switch fits
Add at the service
Level 2 EV charger (48 A, hardwired)
Plan the circuit when you size the service: a 48 A charger needs a 60 A circuit and adds about 11.5 kVA to the load calculation.
- Circuit
- 60 A breaker, hardwired
- Tip
- Run conduit to the garage during construction
How it all goes together: underground service guide · overhead service guide.