Quick answer

A new 200-amp underground service typically needs Schedule 40 PVC conduit and long-radius sweeps, a Schedule 80 riser with an expansion fitting, warning tape, a utility-approved ringless meter-main, 4/0 aluminum service conductors if you supply the lateral, two 8-foot ground rods with acorn clamps, 6 AWG copper grounding conductor, and a torque tool for the lugs.

CategoryPart
ConduitGray Schedule 40 PVC electrical conduit (belled end)
Conduit fittingPVC expansion fitting for the riser
TrenchUnderground electric warning tape
Conductors4/0-4/0-2/0 aluminum URD cable
ConductorsSouthwire aluminum SEU service entrance cable
Meter baseEaton MBE24L200BTS 200 A meter breaker (EUSERC)
Meter baseMeter-main with underground pull section
PanelMain breaker load center with breaker kit
GroundingCopper-bonded ground rods with acorn clamps
GroundingBare solid copper grounding wire
TerminationTorque screwdriver or torque wrench
Add at the serviceEaton CHSPT2ULTRA whole-home surge protector
Add at the serviceGenerator interlock kit and 50 A power inlet box
Add at the serviceWhole-home standby generator with transfer switch
Add at the serviceLevel 2 EV charger (48 A, hardwired)

Check your utility first. Utilities set conduit size, burial depth and approved meter bases. Buying the wrong meter base is the most common and costly mistake.

Gray Schedule 40 PVC electrical conduit (belled end)

Conduit

Gray Schedule 40 PVC electrical conduit (belled end)

The standard underground raceway for a service lateral. Belled ends glue together without separate couplings.

Size
2 in. or 3 in., per your utility
Use
Underground run; Schedule 80 for the exposed riser
Pair with
PVC cement, long-radius sweeps

Conduit fitting

PVC expansion fitting for the riser

Lets the riser move as soil settles or freezes so the meter base isn't pulled off the wall.

Use
Riser below the meter base, where your utility requires it

Trench

Underground electric warning tape

Required about 12 inches above buried service conductors under NEC 300.5(D)(3).

Color
Red, printed CAUTION BURIED ELECTRIC LINE

Conductors

4/0-4/0-2/0 aluminum URD cable

The common 200-amp underground service lateral cable when the customer supplies the conductors.

Use
200 A service lateral in conduit
Check
Whether your utility supplies the lateral
Southwire aluminum SEU service entrance cable

Conductors

Southwire aluminum SEU service entrance cable

Unarmored service entrance cable with two insulated conductors and a bare concentric neutral, sold by the foot.

Size
4/0-4/0-4/0 Al for 200 A (NEC 310.12)
Use
Weatherhead to meter, or meter to an outdoor disconnect
Not for
Indoor feeders that need a separate ground; use SER
Eaton MBE24L200BTS 200 A meter breaker (EUSERC)

Meter base

Eaton MBE24L200BTS 200 A meter breaker (EUSERC)

A 200-amp meter socket with a 2-space Type BR breaker section in one NEMA 3R outdoor enclosure. It is a main-lug unit, so no main breaker is included; you add Type BR breakers.

Rating
200 A, 120/240 V single phase
Spaces
2 spaces, up to 4 circuits (Type BR breakers)
Socket
4-jaw, ring type, EUSERC design
Feed
Overhead or underground; line lugs #6 to 250 kcmil
Check
EUSERC and ring-type sockets are used mainly by western U.S. utilities. Many others, including AEP, require ringless. Confirm your utility's approved list.
Meter-main with underground pull section

Meter base

Meter-main with underground pull section

Wide enclosure with large line lugs below the meter for heavy underground laterals, plus a main breaker and neutral/ground bar.

Use
Underground services with large aluminum conductors
Check
Lug range fits your conductors; utility approval
Main breaker load center with breaker kit

Panel

Main breaker load center with breaker kit

Indoor panel with a main breaker and a starter set of single- and double-pole breakers. With an outdoor meter-main, it is fed as a subpanel with neutrals and grounds kept separate.

Size
200 A, enough spaces for future circuits
Check
AFCI/GFCI breakers required for your circuits
Copper-bonded ground rods with acorn clamps

Grounding

Copper-bonded ground rods with acorn clamps

Two 8-foot rods spaced at least 6 feet apart are standard for a new service. Acorn clamps must be listed for direct burial.

Size
5/8 in. x 8 ft
Qty
Two rods, two clamps
Bare solid copper grounding wire

Grounding

Bare solid copper grounding wire

The grounding electrode conductor from the service to the ground rods.

Size
6 AWG solid copper to rods (NEC 250.66(A))
Length
Enough to reach both rods in one continuous run

Termination

Torque screwdriver or torque wrench

NEC 110.14(D) requires lugs to be tightened to the manufacturer's torque value with a calibrated tool.

Range
Covers meter-base lug values, often 250+ in-lb

Add at the service

Eaton CHSPT2ULTRA whole-home surge protector

A Type 2 surge protective device that mounts in two breaker spaces. NEC 230.67 requires surge protection on new and replaced dwelling services.

Type
Type 2 SPD, 108 kA
Fits
Eaton BR and CH panels; check your panel brand

Add at the service

Generator interlock kit and 50 A power inlet box

Lets a portable generator back-feed the panel safely by locking out the main breaker. A lower-cost alternative to a transfer switch.

Check
Kit must be listed for your exact panel model
Pair with
50 A inlet box and generator cord

Add at the service

Whole-home standby generator with transfer switch

A natural gas or propane standby generator with an automatic transfer switch powers the house within seconds of an outage.

Size
22–26 kW for most 200 A homes with load management
Plan
Decide before the service is built so the transfer switch fits

Add at the service

Level 2 EV charger (48 A, hardwired)

Plan the circuit when you size the service: a 48 A charger needs a 60 A circuit and adds about 11.5 kVA to the load calculation.

Circuit
60 A breaker, hardwired
Tip
Run conduit to the garage during construction

How it all goes together: underground service guide · overhead service guide.